Please enable JavaScript to view this site.

Phoenix - User Help

To record an Irrigation:

Tick the paddocks/sub-paddocks where the irrigation will occur.

Click Activities_Button on the toolbar and select Irrigation.

Enter a date and select an irrigation activity from the Dropdown list.

The total area of the ticked paddocks/sub-paddocks will be displayed below that. The Details button allows you to edit the area for each location selected.

Select the water source from the dropdown list.

If you have selected a bore or river, then select a water licence if required.

Enter the meter/level/volume details for the quantity of water used.

Enter any water costs (other fields will auto calculate).

Enter any pumping costs. You can enter a total cost or a $/ha cost. Alternatively you can click on the Details button to identify and calculate the costing for each pumping unit.

Enter any labour cost either as a total, $/ha or click on the Details button to identify the labourer/s and their costings.

Set the status and click Save.

Irrigation

NB: To delete an unwanted line in a grid, select the line and press Ctrl and the Delete key together or right mouse click. You will then see a confirmation window to delete the line.

©2020 AGDATA Holdings Pty Ltd trading as AGDATA Australia